The Road Hanging Without Any Supports
Published Nov 5, 2026 · 0:41
Likes: HiddenAvg views/h: –
Its recent uploads
#6 of its last 20
Its uploads we’ve seen, oldest left, by views (log scale). Dashed: its usual.
Performance in numbers
The Road Hanging Without Any Supports by Dark Narr has – views, 1 minute after it was published on November 5, 2026.
| Views | – | |
|---|---|---|
| Likes | Hidden | |
| Published | November 5, 2026 | |
| Length | 0:41 | |
| Category | Science & Technology | |
| Channel | Dark Narr | |
| Channel subscribers | 41K |
Views
–
Not enough reads yet.
Not enough reads yet.
Views/h now
–
Not enough reads yet.
× usual
–
Not enough reads yet.
Where it charts
Not on any chart we track right now.
From the YouTube record
Fields of the video as the YouTube API returns them.
- Published
- Nov 5, 2026, 10:30 AM
- Duration
- 0:41
- Category
- Science & Technology
- Audio language
- English (en-US)
- Title language
- English (en-US)
- Captions
- No
- Definition
- HD
- Format
- 2D
- License
- Standard YouTube
- Licensed content
- Yes
- Embeddable
- Yes
- Made for kids
- No
- Age-restricted
- No
- Paid promotion
- No
- Public stats
- Yes
Topics
- Lifestyle
Title and description in 1 languages
- English
Description
Discover the Dadong River Gorge Iron Cable Bridge in Chongqing, China. Suspended nearly 1,000 feet above a canyon, this unusual engineering project looks almost impossible to build. Stretching nearly 800 feet between two mountain cliffs, the bridge was constructed without a single pound of concrete. Engineers used 155 high-strength steel cables stretched tightly between the cliffs to create a structure capable of carrying up to 22 times its own weight. Built in just four months, this bridge wasn't designed for everyday commuters or public traffic. It was created specifically to support heavy construction vehicles working on another massive bridge nearby. And the price makes the project even more remarkable. The entire structure cost around $280,000. It was only intended to serve for a limited period of two to three years. Once its job was complete, the bridge was dismantled and its materials were recycled for future construction. From its unusual cable-based design to its temporary purpose and remarkably low cost, the Dadong River Gorge Iron Cable Bridge is a fascinating example of unconventional engineering. #DadongRiverGorgeBridge #Chongqing #China #BridgeEngineering #CivilEngineering #StructuralEngineering #Engineering #Architecture #Infrastructure #Construction #Technology #Megaprojects #EngineeringMarvelShow all
Discover the Dadong River Gorge Iron Cable Bridge in Chongqing, China. Suspended nearly 1,000 feet above a canyon, this unusual engineering project looks almost impossible to build. Stretching nearly 800 feet between two mountain cliffs, the bridge was constructed without a single pound of concrete. Engineers used 155 high-strength steel cables stretched tightly between the cliffs to create a structure capable of carrying up to 22 times its own weight. Built in just four months, this bridge wasn't designed for everyday commuters or public traffic. It was created specifically to support heavy construction vehicles working on another massive bridge nearby. And the price makes the project even more remarkable. The entire structure cost around $280,000. It was only intended to serve for a limited period of two to three years. Once its job was complete, the bridge was dismantled and its materials were recycled for future construction. From its unusual cable-based design to its temporary purpose and remarkably low cost, the Dadong River Gorge Iron Cable Bridge is a fascinating example of unconventional engineering. #DadongRiverGorgeBridge #Chongqing #China #BridgeEngineering #CivilEngineering #StructuralEngineering #Engineering #Architecture #Infrastructure #Construction #Technology #Megaprojects #EngineeringMarvel
◆ Calculated by viralshooter · all other figures from the YouTube API