Train Brake FAILS & It Runs 463 KM! SCARY Vande Bharat Case in India #shorts
Published Nov 19, 2026 · 0:59
Likes: 66KAvg views/h: 8K
Its recent uploads
#10 of its last 20 · its usual 3M
Its uploads we’ve seen, oldest left, by views (log scale). Dashed: its usual.
Performance in numbers
Figures as of Nov 26, 2026, 2:25 PM UTC.
Train Brake FAILS & It Runs 463 KM! SCARY Vande Bharat Case in India #shorts by FactTechz has 1M views, 8 days after it was published on November 19, 2026.
It is getting 183 views an hour now, 0.5× what FactTechz’s uploads usually get (3M).
Its best day so far was Nov 20, with 827K views, and it is watched most around 10 AM UTC.
| Views | 1M | 1,359,222 |
|---|---|---|
| Views per hour now | 183 | |
| Times its channel’s usual | 0.5× | |
| Its channel’s usual per upload | 3M | 2,592,110 |
| Best day | Nov 20 · 827K | 827,236 |
| Busiest hour | 10 AM UTC | |
| Likes | 66K | 65,944 |
| Published | November 19, 2026 | |
| Length | 0:59 | |
| Category | Education | |
| Channel | FactTechz | |
| Channel subscribers | 22M |
Views
1M
Views/h now
183
▼ 45%
× usual
0.5×
its usual 3M
Views per day
827K
best day, Nov 20
When it’s watched
10 AM
its busiest hour, your time
On YouTube’s Trending chart
Not on any chart we track right now.
From the YouTube record
Fields of the video as the YouTube API returns them.
- Published
- Nov 19, 2026, 2:25 PM
- Duration
- 0:59
- Category
- Education
- Audio language
- Hindi (hi)
- Title language
- English (en)
- Captions
- No
- Definition
- HD
- Format
- 2D
- License
- Standard YouTube
- Licensed content
- Yes
- Embeddable
- Yes
- Made for kids
- No
- Age-restricted
- No
- Paid promotion
- No
- Public stats
- No
Title and description in 1 languages
- English
Tags (18)
- facttechz
- indian trains
- tech
- train tech
- vande bharat
- indian railways
- loco pilot
- train driver
- brake system
- paseenger train
- train accidents
- train news india
- locomotives
- engine
- coach brakes
- new train tech
- door of train
- ac coach train
Description
Empty Vande Bharat Travels 463 km With Coach Brakes Isolated, Probe Ordered An empty Vande Bharat train travelled approximately 463 kilometres with its coach brakes reportedly isolated, prompting South Eastern Railway to order an investigation. The incident occurred on October 24 during a transfer from Hatia in Jharkhand towards Jhansi in Uttar Pradesh, but became widely reported in November. No passengers were aboard the rake. The train was being hauled by a freight locomotive rather than operating as a regular Vande Bharat passenger service. Its coach braking system should have been integrated with the locomotive’s controls. According to the railway order cited in reports, that arrangement was not functioning properly. One loco pilot reported poor braking after departure and submitted a written complaint at Ranchi. Another driver subsequently raised concerns after taking over at Muri. Despite those warnings, the train continued until an inspection at Deen Dayal Upadhyaya station found that the brakes on every coach had been isolated. The rake reportedly relied on the hauling locomotive’s brakes, including regenerative braking. This means it was not travelling with absolutely no braking capability, but its coaches were not contributing the braking force required for safe operation. A November 7 order called for a detailed inquiry into maintenance checks, staff responses and crew actions. Preliminary findings identified failures across several levels. The case raises a serious question for Indian Railways: why did repeated warnings fail to stop an unsafe movement? Advanced train technology still depends on correct preparation, effective inspections and prompt action when crews report trouble. The investigation must establish responsibility and identify safeguards that prevent similar lapses during future transfers. Subscribe to FactTechzShow all
Empty Vande Bharat Travels 463 km With Coach Brakes Isolated, Probe Ordered An empty Vande Bharat train travelled approximately 463 kilometres with its coach brakes reportedly isolated, prompting South Eastern Railway to order an investigation. The incident occurred on October 24 during a transfer from Hatia in Jharkhand towards Jhansi in Uttar Pradesh, but became widely reported in November. No passengers were aboard the rake. The train was being hauled by a freight locomotive rather than operating as a regular Vande Bharat passenger service. Its coach braking system should have been integrated with the locomotive’s controls. According to the railway order cited in reports, that arrangement was not functioning properly. One loco pilot reported poor braking after departure and submitted a written complaint at Ranchi. Another driver subsequently raised concerns after taking over at Muri. Despite those warnings, the train continued until an inspection at Deen Dayal Upadhyaya station found that the brakes on every coach had been isolated. The rake reportedly relied on the hauling locomotive’s brakes, including regenerative braking. This means it was not travelling with absolutely no braking capability, but its coaches were not contributing the braking force required for safe operation. A November 7 order called for a detailed inquiry into maintenance checks, staff responses and crew actions. Preliminary findings identified failures across several levels. The case raises a serious question for Indian Railways: why did repeated warnings fail to stop an unsafe movement? Advanced train technology still depends on correct preparation, effective inspections and prompt action when crews report trouble. The investigation must establish responsibility and identify safeguards that prevent similar lapses during future transfers. Subscribe to FactTechz
◆ Calculated by viralshooter · all other figures from the YouTube API